The North-South Corridor at Lentor Avenue: What LTA’s 2029 and 2031 Dates Mean for the Lentor Central Condo
The new GuocoLand-led condo on the Lentor Central site, awarded by URA on 6 March 2026 to GuocoLand (Singapore), Intrepid Investments and TID Residential, is targeted for launch in the first half of 2027. On the road network, Lentor Avenue is where the North-South Corridor (NSC) changes from a viaduct to a tunnel. On 17 September 2026 the Land Transport Authority (LTA) pushed both sections back by about two years. If you are weighing a home here, two questions follow: how long will the corridor works along Lentor Avenue go on, and when can you actually drive on it? This guide sets out LTA’s and the Ministry of Transport’s answers as at 2 November 2026.
Why Lentor Avenue matters on this road
LTA describes the NSC as a 21.5 km corridor made up of an 8.8 km viaduct and a 12.3 km tunnel. It will link to the Seletar Expressway, Pan-Island Expressway and East Coast Parkway and ease traffic on the Central Expressway and on Thomson and Marymount Roads. The two sections meet at Lentor Avenue:
- North of Lentor: the viaduct runs from Admiralty Road West to Lentor Avenue.
- South of Lentor: the tunnel runs from Lentor Avenue to the East Coast Parkway, which is the stretch towards the city.
LTA has not said in these announcements where the entry and exit points serving Lentor drivers will be. Treat that as unknown until LTA publishes it.
The revised dates
| Section | Earlier target | Target since 17 September 2026 |
|---|---|---|
| Viaduct, Admiralty Road West to Lentor Avenue | 2027 | Opens in phases from 2029 |
| Tunnel, Lentor Avenue to East Coast Parkway | 2029 | Opens in phases from 2031 |
LTA blamed harder rock and difficult ground at Gambas Avenue and Woodlands Avenue 8, fractured rock under the live North-South Line tunnel at Novena, and harder-than-expected rock at Thomson. It said more than 90% of the foundation works for both the viaduct and the tunnel were done as of August 2026. On 6 October 2026, Transport Minister Jeffrey Siow confirmed the 2029 and 2031 dates in Parliament and noted that this is not the first time LTA has revised the corridor’s timeline.
When the works around Lentor should ease
The minister’s reply gives the milestones that matter most if you will live nearby:
- By the end of 2027: the most major structural works, which create the most noise and dust, should be complete. LTA adds that more of the work moves underground from 2027.
- From 2028: roads, footpaths and other affected spaces are to be reinstated.
- By mid-2028: the surface of Lentor Avenue, which the minister named alongside Sembawang Road, should be fully restored.
Once traffic moves onto the corridor, LTA plans to give the roads along it progressively more space for walking, cycling, public transport and community use.
Lining this up with the Lentor Central condo
| Date | What is expected | Source |
|---|---|---|
| First half of 2027 | Targeted launch of the Lentor Central condo | GuocoLand, 2 July 2026 |
| End of 2027 | Noisiest, dustiest NSC structural works largely done | Minister for Transport, 6 October 2026 |
| Mid-2028 | Lentor Avenue surface fully restored | Minister for Transport, 6 October 2026 |
| From 2029 | Viaduct to Lentor Avenue opens in phases | LTA, 17 September 2026 |
| From 2031 | Tunnel from Lentor Avenue to the East Coast Parkway opens in phases | LTA, 17 September 2026 |
| Not announced | Construction start and completion (TOP) of the condo | Contact us |
Because GuocoLand has not announced a completion date, nobody can tell you yet whether the corridor will be open, or which sections, by the time you collect your keys. These are targets, and the corridor’s dates have moved before.
How to weigh it
- If you drive to the city: the tunnel section is the one you would use, and it is the later of the two, from 2031. Plan your daily drive on the roads that exist today, and treat the corridor as a later bonus rather than a reason to buy.
- If you drive north: the viaduct towards Admiralty Road West is the earlier section, opening in phases from 2029.
- If you mainly take the train: the corridor matters less. GuocoLand says the site is next to Lentor Modern, whose mall has direct access to Lentor MRT on the Thomson-East Coast Line. Our guide to where Lentor MRT takes you without changing trains covers that commute.
- If road works near home worry you: visit Lentor Avenue on a weekday to see the current works. Ask which towers face the main roads once the site plan is out, and compare stacks on the floor plans page when layouts are released.
Prices have not been released. The price page will carry GuocoLand’s price list, and you can register on the showflat page to hear when previews are announced. More on the surroundings is on the location page.
Get Lentor Signature Updates First
Get the latest price list, available units and floor plans for Lentor Signature — no obligation.