Lentor Signature and the Thomson-East Coast Line: Where Lentor MRT Takes You Without Changing Trains
Lentor Signature is the new private condominium planned on the URA Lentor Central site, awarded on 6 March 2026 to GuocoLand (Singapore), Intrepid Investments and TID Residential. GuocoLand says the site is next to Lentor Modern, whose mall has direct access to Lentor MRT on the Thomson-East Coast Line (TEL). If your household will use the train every day, the useful question is where that one line takes you without changing trains, and where you would need to change. This guide follows LTA's own station list for the TEL, and now includes the two Stage 5 stations that LTA says open on 26 December 2026.
Lentor is one stop on a single line
Lentor station opened with TEL Stage 2 on 28 August 2021, together with Springleaf, Mayflower, Bright Hill, Upper Thomson and Caldecott. Lentor is not an interchange: every trip on another line starts with a TEL ride to one of the interchange stations below. LTA lists stations in line order, so the stop counts here are counted from that list, using stations that are open, or have a confirmed opening day.
Heading north
| Stop from Lentor | Station | Change to |
|---|---|---|
| 1 | Springleaf | None |
| 2 | Woodlands South | None |
| 3 | Woodlands | North-South Line |
| 4 | Woodlands North (end of line) | None today. LTA says arriving passengers on the upcoming Johor Bahru-Singapore RTS Link will transfer here to the TEL |
Heading south, to town and the east coast
| Stop from Lentor | Station | Change to |
|---|---|---|
| 1 to 3 | Mayflower, Bright Hill, Upper Thomson | None |
| 4 | Caldecott | Circle Line |
| 5 | Stevens | Downtown Line |
| 6 and 7 | Napier, Orchard Boulevard | None |
| 8 | Orchard | North-South Line |
| 9 and 10 | Great World, Havelock | None |
| 11 | Outram Park | East-West Line and North East Line |
| 12 and 13 | Maxwell, Shenton Way | None |
| 14 | Marina Bay | North-South Line and Circle Line |
| 15 | Gardens by the Bay | None |
| 16 to 22 | Tanjong Rhu, Katong Park, Tanjong Katong, Marine Parade, Marine Terrace, Siglap, Bayshore | None |
| 23 | Bedok South (from 26 December 2026) | None |
| 24 | Sungei Bedok (from 26 December 2026, new end of line) | Downtown Line |
Three stations on this stretch are built but not yet open, so they are left out of the count: Mount Pleasant (between Caldecott and Stevens) and Marina South (between Marina Bay and Gardens by the Bay), whose opening dates LTA says will be advised, and Founders' Memorial (before Tanjong Rhu), which LTA says will open together with the Founders' Memorial itself. When they open, the stop count to stations beyond them rises by one each. That is also why LTA describes the completed line as 29 operational stations rather than the full 32.
What Stage 5 changes from 26 December 2026
On 4 November 2026 LTA announced that TEL Stage 5 and the Downtown Line 3 Extension open for passenger service on 26 December 2026. Three stations open that day: Bedok South and the Sungei Bedok interchange on the TEL, and Xilin on the Downtown Line. LTA says this completes the TEL's five-stage planned opening.
- A second Downtown Line interchange. Until now, the only place to switch between the TEL and the Downtown Line was Stevens, five stops from Lentor. From 26 December, Sungei Bedok, 24 stops from Lentor, is a second one, at the eastern end of the line.
- Easier trips to eastern job hubs. LTA names Changi Business Park and Tampines Regional Centre as places the new stations make easier to reach. Its own example is Havelock, which is 10 stops from Lentor on the TEL, to Changi Business Park via the TEL and Downtown Line in about 45 minutes, against about 70 minutes today. That saving applies from Havelock; a trip from Lentor adds the ten stops before it.
- Bedok South. This is a new stop on the TEL itself, so it is a single ride from Lentor with no change.
What is still to come: the extension to Changi Airport
In July 2025 LTA announced a 14 km extension from Sungei Bedok to a new Changi Terminal 5 station, an interchange with the Cross Island Line, before the line continues to Tanah Merah. The existing East-West Line stretch between Tanah Merah and Changi Airport is to be converted to TEL systems. Terminal 5 itself is scheduled for completion in the mid-2030s. LTA has not given an opening date for the extension, so do not count on it for a commute you need in the first years after you move in.
How to use this before you choose a unit
- Map each regular trip. Write down where each adult works and where each child studies, then find the nearest station on the tables above. A destination on the TEL is a single ride; anything else means one change at the interchange listed. If someone in your household works in the east, compare a change at Stevens with a change at Sungei Bedok once Stage 5 is running.
- Check the walk at your end, not just the stop count. The time from your front door to the platform depends on where the towers and gates sit on the site. The site plan has not been released yet. Ask for it at the Lentor Signature showflat and compare stacks on the floor plans once they are out.
- Count only what has a date. Stage 5 now has a confirmed opening day; the airport extension and the three unopened stations do not. The Lentor Signature price list has not been released; GuocoLand targets a launch in the first half of 2027.
For more on the neighbourhood around the site, see the Lentor Signature location page.
Get Lentor Signature Updates First
Get the latest price list, available units and floor plans for Lentor Signature — no obligation.